References from the Energy Sector

  • Installation of a telecommunications container

  • Full implementation and commissioning of the entire system

  • Replacement of low-pressure compressors

  • Execution of the complete low- and extra-low voltage electrical systems

Solar Power Plants

  • VPP SOLAR Ltd.
    Complete electrical implementation of 59 solar power plants (498 kW each) and 1 plant (100 kW) at 24 locations, including earthwork and landscaping upon request

  • Electrical implementation of MVM-OVIT telecommunications infrastructure

Construction, Renovation and Maintenance of Sports Field Electrical Systems
For natural grass, artificial turf, and tartan-surfaced football fields:

  • Besenyőtelek – 42×22 m football field

  • Csabdi – 14×26 m football field

  • Soroksár – 72×111 m football field

  • Dunasziget – 42×22 m football field

  • Biatorbágy – 72×111 m football field

  • MOL Fehérvár Sóstó – Football fields 1, 2, 3, and 4

  • Pécs Dárdai Pál Academy – 72×111 m football field

  • Szentlőrinc – 72×111 m football field

  • Kozármisleny – 72×111 m football field

  • Onga – 72×111 m football field

  • Vasas Budapest (Fáy Street and Népfürdő Street) – 3 football fields

  • Maglód – 44×64 m football field

Tennis Courts

  • Budapest Muskétás Tennis Centre

  • Budapest Svábhegy Tennis Centre

KFKI Site – General contracting of spent fuel storage facility hall

  • Construction of AXELLIA pharmaceutical raw material production facility

  • Installation and implementation of access control systems for G4S Ltd.

  • Electrical renovation of UTIBER Office Building, Budapest

  • Modernisation of lighting systems in offices and industrial halls

  • Infrastructure route construction at Budapest Airport

Construction Industry References

  • PINTÉR MŰVEK, Kecel – Installation of access control and surveillance system for the factory and open-air museum

  • Újhartyán – Construction of police vehicle shelter at axle load measuring station

  • Szőlőliget Ökopark – Electrical implementation of a 37-apartment residential complex and service centre

Demolition Works

  • Demolition of a 2-storey office building at 6 Klapka Street, Budapest XIII district

  • Complete electrical demolition of Szabolcs Street Hospital, Budapest XIII district

  • Full electrical demolition of the former Waterworks Office Building at 23–27 Váci Road, Budapest XIII district

  • Electrical demolition works at Puskás Ferenc Stadium

Lightning Protection

  • Complete lightning protection for the engineering structures on section I of the M4 expressway construction

verticalr.hu
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.